The VELO Home Page

Home Vertex Locator E-mail Notes Meetings Subsystems Search
 
CERN logo UNIVERSITY of GLASGOW LPHE
Amsterdam VELO CERN VELO Glasgow VELO Heidelberg LHCb ASIC Lausanne LHCb Liverpool VELO Syracuse

 

VELO e-LOGs

NEWS:

 

Module production status summary

Updated list of 2007 conferences, see here !

 

 

17th October - November 4

Installation of VELO

at IP8

 

More information

 

**NEW**

Watch a film about LHCb and the VELO modules

Learn more on the VELO Outreach pages

VELO TDR

 

PROGRAMME OF WORK AND ACTIVITIES

  Activity: Contact:
Project planning Paula Collins / CERN, Eddy Jans / NIKHEF
VELO Commissioning Olaf Behrendt / CERN
Mechanics, Vacuum and Cooling Hans de Vries / NIKHEF
Silicon , Hybrids , Modules Themis Bowcock / Liverpool
Module Burn-in Alison Bates / Glasgow
L0 electronics (FE) Jan Buytaert / CERN , Michael Schmelling / Heidelberg
L1 electronics Raymond Frei / Lausanne (analog link), Guido Haefeli / Lausanne (Tell1)
TELL1 algorithms Tomasz Szumlak / CERN
Software Coordination Chris Parkes / Glasgow
Detector Assembly Paula Collins / CERN
Test beam 2007 Test beam 2006 Test beam 2004 (old) Marina Artuso / Syracuse
ECS  Stefano de Capua, Lars Eklund / CERN
Low Voltage System Raymond Frei / Lausanne
High Voltage System Lars Eklund , Chris Parkes/ Glasgow
Installation in Pit 8 Eddy Jans / CERN
VELO Outreach Tara Shears/ Liverpool.

INFORMATION:

VELO online documentation VELO Twiki pages
Progress: An almost complete list of recent presentations (maintained by Jan Buytaert)
Publications:: VELO TDR , VELO section of LHCb Light TDR , VELO Notes ( with internal ) ,
    Drafts of notes , Technical documents in CERN's EDMS , posters
Radiation at VELO: see maps from LHCb Background page and their summary table

Pictures:

Modules 9-Nov-2005, PR03 sensor with K03 hybrid , test beam set-up 2004, 2002, 2001, 2000

Material for status reports: 

RRB 2003/2RRB 2003/1, 2002, RRB 2002/2, RRB 2002/1, 2001

Conferences:

list of conferences, past VELO presentations

Related projects:

Level 0 Pile Up Veto Trigger, Level 1 Vertex Trigger, Beam pipe

Mailing lists:

General, Test beam, Software

VELO MEETINGS:

All VELO meetings on CDS: CERN CDS Agenda Pages
CERN-based: weekly on Friday 14:00 Room 32-1-A24 (see CDS above)
Liverpool group: Minutes , Production progress on eLog
NIKHEF group: Minutes
Reviews and Workshops: click here

MISCELLANEOUS:

VELO request to CB for completion of funding of 42 modules
VELO statement concerning commissioning with testbeam

Magnetic field at the VELO position (January.'03)

Radiation length of the VELO (Feb.2003), realistic design (March 2001), addendum (March 2001)

Displacement Damage in Silicon

RD50

MOEDAL

Buy a VELO T-shirt
Old News

Shipping of radioactive material

 

 

This page last edited by PC on November 09, 2007. It was accessed Hit Counter times since January 1, 2005.